Terminal 1 Access Roadway Bridge Rehabilitation

Terminal 1 Access Roadway Bridge Rehabilitation

MSP Airport Construction Projects

Timeline: May 2024 - September 2024

Construction Cost: $4.1 million

Description: Phased replacement of the expansion joints on the upper roadway at Terminal 1.

Project Summary

  • Schedule roadway maintenance at Terminal 1.

  • Joint replacement, sealing, and cleaning on the upper roadway (Departures level).

 

Project Impacts

  • Vehicular access will be maintained throughout the project.

  • Portions of the upper and lower roadways will be periodically closed.

  • Traffic control barriers and signage will be implemented to maximize safety and encourage traffic flow.

 

Travel Tips

 

MSP Airport Construction Projects Home  

The upper roadway at Terminal 1 will undergo scheduled maintenance from May 2024 - September 2024.

Project map depicting Terminal 1 roadway construction Project map depicting Terminal 1 roadway construction

The upper roadway at Terminal 1 will undergo scheduled maintenance from May 2024 - September 2024.

Terminal 1 Departures Curb Terminal 1 Departures Curb

The upper roadway at Terminal 1 will undergo scheduled maintenance from May 2024 - September 2024.

Terminal 1 Departures Roadway Terminal 1 Departures Roadway
Previous Next
  • Demo slide 1
  • Demo slide 2
  • Demo slide 3